Select Page

CPWR REPORT

Although solar-ready designs have become a new standard for residential houses in preparation for the installation of a roofing solar system, information regarding the safety of the workers while installing the solar panels has been insufficient. This study focuses on the development of a Prevention through Design (PtD) checklist and Building Information Modeling (BIM) models for new solar-ready houses with the aim of reducing or eliminating worker injuries.

JOIN OUR MAILING LIST

Receive our monthly e-newsletter, webinar announcements, and other news.

Other CPWR Websites

CPWR manages a series of websites that address specific hazards or audiences. See the full list.

SC-SMIS logo